Project Description
EON Procter & Gamble Berlin
Year of construction 2017
Combined Heat and Power (CHP) system to support the plant’s demand for electricity, heat, and cooling
CHP-Cooling system:
- Planning, delivery, and installation of the entire system, including the reinforced concrete building and lightning protection system to accommodate the plant technology.
- 1200 kW absorption chiller by Hitachi.
- 2 x 1350 kW dry coolers with adiabatic spraying, manufactured by Cabero.
- Water treatment with water softening and reverse osmosis system.
- Cold, cooling, and hot water piping with flow rate monitoring up to DN 300.
- 9.5-ton steel structure in hot-dip galvanized design to accommodate the adiabatic dry coolers.
Control system:
- Siemens S7
- Integration into the building automation system
- Energy management